With the feedback from the mid-term review, we have nailed down our design and made full scale drawings from Eric's CAD model. With most of the design work done, now we are officially working as manufacturing groups:

Machining: Cliff, Rachael, Flo, Cassie, Bryan, Matt K., Eric, Seungkyun, and Matt H.

Jig and Prep: Yarrow, Fiona, and Bryan

Carbon Fiber: Krisa, Soomi, Mingzi, and Kyu

Every new group has assembled parts lists to order parts and to manufacture parts. Each group has come up with their own arrangements to finish the manufacturing for their specific areas. We officially have about 3 weeks left in the semester, with only 6 studios days together, and Thanksgiving in the middle. Our new calendar is strategically planned to finish with a little give at the end incase we need more time for assembly and final touches.

December 16th is the day!
Count Down: 23 days!